Full home renovations in London
Whole house renovations across London, planned as one project and run by one team from the first survey to handover.
Each room affects the work around it
In a whole home renovation, one decision leads to the next. A new doorway changes where furniture sits, which changes where the sockets and lighting need to go. We work through those knock-on effects across the property before work starts.
See our work
Spaces we’ve designed and installed across London homes
Our full home renovation services
Living and dining spaces
Layouts, lighting, flooring and finishes considered across connected rooms.
Kitchens
Cabinetry, worktops, appliances, lighting and installation planned within the wider renovation.
Bathrooms
Sanitaryware, brassware, surfaces, lighting and installation across one or more bathrooms.
Bedrooms
Storage, flooring, lighting and finishes developed for each room.
Hallways and landings
Flooring, lighting, decoration and storage across the main circulation spaces.
Home offices
Power, lighting, storage and fitted joinery planned around daily use.
Joinery and storage
Wardrobes, shelving, fitted cabinetry and storage developed for the available space.
Flooring
Timber, tile, stone and carpet specified across adjoining areas.
Lighting and electrical
Lighting plans, sockets, switching and electrical work coordinated with the design.
Plumbing and heating
Plumbing alterations, radiators and heating requirements considered alongside the wider project.
Decoration
Surface preparation, painting, wall finishes and final decoration.
Internal layouts
Room arrangements and circulation reviewed as part of the overall plan.
Running a whole home project
Sequencing the work
Lead times and storage
The right team size
The order of work matters more than on any single room. We plan how each trade follows the last, so the project keeps moving without anyone waiting.
Products are ordered early to suit the programme, stored until they're needed and delivered in stages, so nothing holds up the work or crowds your home.
More people on site doesn't mean a better result. We plan the number of trades at each stage around the work, not the headcount.
Renovating at any stage
Renovating before you move in
An empty property gives us access to every room from the start. We plan the programme around your moving date and, in flats, arrange approvals with the managing agent or freeholder before work begins.
Before work starts
- Programme set around your moving date
- Building approvals arranged
- Products ordered to lead times
During the works
- Access to every room from day one
- Storage and staged deliveries
- Updates wherever you are

Renovating the home you live in
If you're staying in the property, we phase the work so parts of the home stay usable. If you only have one WC, it stays working throughout, and we provide temporary kitchen worktops to keep disruption to a minimum.
How we phase it
- Rooms completed in planned stages
- A working WC throughout
- Temporary kitchen worktops
Keeping disruption down
- Noise kept to a minimum
- Working areas cleaned daily
- Lived-in areas protected and sealed

Preparing a home for sale
If you're renovating before you sell, we agree the priorities and budget with you at the start and plan the programme around your sale timeline, with a fixed price once the design is agreed.
Planning
- Priorities agreed at the start
- Budget allocated across the rooms
- Programme set around your sale date
Delivery
- Fixed price once the design is agreed
- Work completed in a planned sequence
- Certificates and guarantee handed over




What is included in a full home renovation?
Design and specification
- Survey of the whole property
- Room-by-room plans
- Lighting and electrical layouts
- Products and finishes specified
Supply and installation
- Products ordered to lead times
- Storage and staged deliveries
- Plumbing, electrical and joinery
- Flooring and decoration
Project control and completion
- One programme across all rooms
- Trades sequenced stage by stage
- Checks before handover
- 18-month workmanship guarantee
What affects full home
renovation costs in London?
How much of the property is included
Cost changes with the floor area, the number of rooms and whether the work covers one floor or several. More rooms also means more trades to sequence, which affects the length of the programme as well as the price.
Project coverage
- Floor area included
- Number of spaces
- One level or several
Connected areas
- Hallways and landings
- Shared flooring runs
- Adjoining finishes

The condition of the existing property
Older properties, particularly period homes, often have ageing services and uneven surfaces that need correcting before new work begins. Some of this only becomes clear once existing finishes are removed.
Existing condition
- Walls, floors and ceilings
- Plumbing and electrics
- Previous alterations
Preparation
- Removal of existing finishes
- Surface repairs and levelling
- Remedial work identified

How far the existing property is being altered
Moving doorways, kitchens or bathrooms to new positions adds work beyond replacing finishes, because services and adjoining rooms are affected too. Whether a bathroom or WC can move easily often depends on where the existing drainage runs, which the survey confirms.
Layout changes
- Room arrangements
- Openings and doors
- Fixed elements
Services moved
- Plumbing and drainage
- Lighting and sockets
- Heating and ventilation

The products and finishes selected
Product choices often affect cost more than clients expect. Appliances and worktop materials such as Corian can change a kitchen's cost significantly, and some products have long lead times that shape the programme.
Products
- Kitchen cabinetry
- Appliances and sanitaryware
- Lighting and fittings
Finishes
- Flooring and wall finishes
- Worktops and surfaces
- Joinery finishes and detailing

STEP 5

STEP 6

Trusted by homeowners
Rated 4.9 on Houzz, and Best of Houzz for Service six years running.

The service is almost more of a product, in the sense that you see an initial digital design, and you pretty much pay a defined amount and get more or less exactly what you expected.
W Morris
Wandsworth


We are delighted with the transformation of our small shower room. The whole experience from the initial contact with Ali through the design and installation has been marvellous.
H Burrows
Richmond


Absolutely delighted with our bathroom redesign and couldn’t recommend the team more highly. From the very beginning, the whole process ran exceptionally … with great communication throughout.
C Pepper
Hampstead

Common renovation questions
Answers on pricing, timing, scope and how your project is handled.
When do product decisions need to be made?
As early as possible. Bespoke items and some materials have long lead times, so the main product choices are agreed during design, before the programme is fixed.
How long does a full home renovation take?
As a guide, around 19 to 24 weeks from design to completion. Design takes three to four weeks, followed by preparation, the main infrastructure work, installation and finishing. Your exact programme depends on the size of the property and is set out when your design is approved.
Do you carry out extensions or structural work?
No. We focus on internal renovation, from individual rooms to the whole property. We don’t carry out extensions, loft conversions or structural additions.
Do I need to move out during a full home renovation?
Not necessarily. It depends on the size of the property and how much disruption you’re comfortable with. If you stay, we phase the work so parts of the home stay usable, keep a WC working if it’s your only one, and provide temporary kitchen worktops.
Renovating elsewhere in your home?
We design, supply and install bathrooms, kitchens and full homes across London.

London locations served
Kingston
Islington
Hampstead
Chiswick
Wimbledon
Putney
Battersea
Clapham
Kensington
Chelsea
Fulham
Richmond

Talk to us about your home
A complimentary 30‑minute appointment to talk through the rooms and scope involved.